Solution
Magnetic Field Simulations
3D magnetic field simulations for power systems, substations, rail infrastructure and cable networks.
Our simulation team models the magnetic flux density of complete electrical installations, from an MV/LV transformer station to a full high-voltage corridor, and predicts compliance long before construction starts.
Validated models
Every model is calibrated against on-site measurements, giving typical deviations below 10% between prediction and reality.
Scenario studies
Load cases, phase arrangements, cable transpositions and routing variants compared in a single report with cost impact.
Authority-ready reports
Documentation formatted for Swiss cantonal authorities and international permitting processes.
Related
Other solutions
Magnetic Shielding
Turnkey low-frequency magnetic shielding for transformer rooms, substations, cable routes and busbars.
Magnetic Measurements
Calibrated field measurements, compliance reports, diagnostics and forensic investigations.
ORNI / NISV Compliance
Swiss ordinance compliance: planning support, forecasts and mitigation strategies.
Start a project
Tell us the field level you need. We will tell you how to reach it.
A first assessment by one of our engineers is free of charge and usually takes less than 48 hours.
