Data Centers · Northern Europe
Busbar risers in a hyperscale data center
22 µT → 1.9 µT
01 · Challenge
6,000 A busbar risers crossing six floors produced fields far above the operator's internal limit in adjacent staff areas.
02 · Simulation
Parametric simulation of conductor spacing, phase order and shielding thickness across all six floors.
03 · Solution
Phase-optimised riser layout plus continuous aluminium and steel enclosure with ventilated seams.
04 · Execution
Rolled out floor by floor during commissioning, without delaying energisation.
05 · Result
Staff areas measured at 1.9 µT with the shielding cost reduced 30% by simulation-based optimisation.