Data Centers · Northern Europe

Busbar risers in a hyperscale data center

22 µT → 1.9 µT

01 · Challenge

6,000 A busbar risers crossing six floors produced fields far above the operator's internal limit in adjacent staff areas.

02 · Simulation

Parametric simulation of conductor spacing, phase order and shielding thickness across all six floors.

03 · Solution

Phase-optimised riser layout plus continuous aluminium and steel enclosure with ventilated seams.

04 · Execution

Rolled out floor by floor during commissioning, without delaying energisation.

05 · Result

Staff areas measured at 1.9 µT with the shielding cost reduced 30% by simulation-based optimisation.

Start a project

Tell us the field level you need. We will tell you how to reach it.

A first assessment by one of our engineers is free of charge and usually takes less than 48 hours.