Railways · Central Switzerland

16.7 Hz converter station next to housing

Compliance secured pre-build

01 · Challenge

A planned converter station faced objections from neighbours concerned about magnetic exposure.

02 · Simulation

Traffic-based, time-variable simulation of realistic load profiles instead of static worst-case assumptions.

03 · Solution

Optimised cable routing, a shielded cable trench and a partial wall shield on the neighbour-facing façade.

04 · Execution

Design integrated into the civil works package; no retrofit required.

05 · Result

Authority approval obtained on first submission, with a documented margin of 55% below the limit.