Utilities · Zurich, Switzerland

MV/LV substation beneath a residential building

3.4 µT → 0.6 µT

01 · Challenge

A new transformer station in the basement of a residential development exceeded the ORNI installation limit value of 1 µT in the apartments above.

02 · Simulation

A full 3D model of the transformer, LV distribution and cable routing identified the busbar connection — not the transformer — as the dominant source.

03 · Solution

A layered electrical-steel and aluminium ceiling shield combined with a re-routed, transposed busbar arrangement.

04 · Execution

Prefabricated panels installed in four working days without interrupting the construction programme.

05 · Result

Verification measurements confirmed 0.6 µT in all rooms of sensitive use, 40% below the required limit.

Start a project

Tell us the field level you need. We will tell you how to reach it.

A first assessment by one of our engineers is free of charge and usually takes less than 48 hours.